Home / Public Works / Cost of bad work orders

The real cost

What a bad work order actually costs your city.

Budgets count trucks, crews, and fuel. They rarely count the trip to a location that was wrong, the second visit because a report was bad, or the pile that was never reported at all. Those are the costs that quietly compound as a backlog grows.

Three kinds of work order, three kinds of cost

  • An ordinary work order. A real pile in the right place — the trip you intended to make.
  • A bad work order. Wrong location, wrong contents, or a site already cleaned. The crew still rolls; the city still pays.
  • A missed work order. A pile nobody reported. The cheapest-looking line item, and often the most expensive outcome.

Our published model puts a bad order near $200 and a missed pile anywhere from $200 to $2,000 depending on size, location, and how long it sits. Read the full build-up in our cost analysis.

Why we price per corrected order, not per hour

Most vendors bill for activity: hours flown, images captured, reports filed. That rewards volume, not outcomes. Aerbits bills for the work order itself — created, updated, or closed — and charges nothing when nothing changes.

The result is a fee tied to what your department can verify: fewer wasted trips, fewer ghost orders, more piles actually cleared.

Read the full cost analysis →

What you can measure

  • Location corrections and valid closures per week.
  • Avoidable trips — visits to wrong locations or sites already cleaned.
  • Previously unreported piles surfaced by coverage.
  • Verified cleanup time, start to completion.

All of it documented with imagery, so the numbers hold up in a budget conversation.

Discuss a pilot

Bring one service area. Start a practical conversation.

Tell us the area you have in mind and how your crews work today. We'll show what aerial verification would change before you commit to anything.